Bathroom & Shower Tile
Shower surrounds, tub decks, wet walls, bathroom floors, and built-in niches. Every wet installation gets a bonded waterproofing membrane before tile goes down. Serving Thornton, Northglenn, Westminster, and Brighton.
How We Approach Every Shower Build
Demo and Assessment
We remove existing tile, check the framing and subfloor for moisture damage, and assess whether the drain is properly set for the new shower pan depth. Any structural issues get addressed before waterproofing begins.
Substrate and Waterproofing
Cement board goes up on the walls; the floor gets a pre-sloped mortar bed or a foam shower pan set to drain. A bonded waterproofing membrane (Schluter Kerdi, Laticrete Hydro Ban, or equivalent) covers the entire wet area. Corners and transitions are embedded with fabric reinforcement.
Layout and Setting
We plan the tile layout from the most visible focal point, typically the back wall at eye level. Cuts fall at the floor and in less-visible corners. Large-format tiles are back-buttered. We work in sections to maintain consistent coverage.
Grouting and Sealing
After the mortar cures (minimum 24 hours), we grout with the joint width and color you selected. Grout gets sealed after a 72-hour cure. Silicone caulk replaces grout at all changes of plane, including wall-to-floor and wall-to-wall corners, per TCNA guidelines.
Recent Bathroom Work
Bathroom Tile Available In
Ready to Talk Through Your Bathroom Project?
Call (970) 550-2937 or send us a message. Free estimates, no pressure.